Alright, so we are taking a break of a few days here while Karen’s mom is in New Hampshire. We took the opportunity to do some cleanup and put the kitchen back in working condition. The sink and new faucet are back in action and we even did a little bit of painting and priming. I never thought a working faucet and dishwasher could be so exciting.
The fridge area
The stove and new countertops
The new faucet
The new corner cabinets with countertop (and upper cabinet that still needs to be hung
Some more pictures of all the work that has happened recently, including installed cabinets, lots of painting and priming, the sink being removed, the old countertop laminate being taken out, and more finishing work.
Today the new range was delivered and the old stuff was hauled away! Linda fixed the floor under the new range to match the rest of the kitchen and I connected the new range to the cable so we could inaugurate it with a frozen pizza for dinner. Linda also did some more priming and painting.
Helping Daddy out (disclaimer: I didn’t actually use the drill like this, this was staged)
Plug it in and success – the stove works! And the first thing we’ll cook is a frozen pizza.
The oven will never look this clean again.
The new stove in place.
The old oven is gone.
Peter's blog about technology, education, and aviation